Connector Path, Grand Haven – Moore & Bruggink, Inc. was the design and construction engineer for the $1,700,000 Pedestrian / Bike Path Connector project and the construction manager for the combined projects that also included the $2,200,000 MDOT Bridge Improvement project. These projects provide almost one mile of pathway for the final, critical connection of paths in the three communities through the dangerous, high traffic volume intersection of US-31 and M-104. Project elements included bituminous pathway, timber boardwalks, a prefabricated
skybridge, modular concrete retaining walls, guardrail, lighting, landscaping and signage. Close coordination of permitting,
MDOT, the US Army Corps of Engineers, contractor, owners, very tight schedules and a limited budget resulted in a project delivered ahead of schedule and on budget. |